There is one study case in the contingency folder (High Load), which is related to the corresponding operation scenario. The two variations defining the wind parks are active (“Stage 1 WPEast” is set as recording). The contingency analysis is performed using the “Single Time Phase Option” and considering all the N-1 contingencies for lines and transformers.